Point-cloud flag
ModelRAIL flagged a cluster of points near the track centreline. The cross-section and plan show where the points sit relative to the clearance envelope.

Rail infrastructure · Prototype
In the K14 corridor survey, ModelRAIL linked alert OB-013 to the cross-section, the corresponding drone frame and its inspection record.
I built the prototype interface that links corridor GIS, InSAR and 3D inspection views. I also worked on the point-cloud clearance workflow that pairs a flagged object with footage and a register entry.
Follow alert OB-013 from the K14 corridor survey. Compare the point-cloud flag with the linked drone frame, then check the status in ModelRAIL’s inspection record.
ModelRAIL flagged a cluster of points near the track centreline. The cross-section and plan show where the points sit relative to the clearance envelope.

ModelRAIL links OB-013 to this drone frame at 6.3 seconds into the survey recording. The overlay marks the yellow object between the rails.

The prototype recorded the alert and linked its evidence. The footage review was still open at the time of capture.
I built the review interface and worked on linking flagged geometry to footage and the inspection register.
I built ModelRAIL to bring rail maps, InSAR observations, UAV evidence and reporting into one review. This walkthrough shows how someone can go from a movement flag to a documented inspection decision.
The corridor sections, measurements and decisions below are illustrative.
A recent UAV frame covers the slope and trackside drainage. The sample note records no visible change.
View the K14 digital twinSelect an image to view it at full size.


